Solar panels for farm buildings
Most modern farm sheds in Ireland can take solar panels. A box-profile steel roof is ideal, each kWp needs 4 to 5 m² of roof, and panels on a farm building roof are exempt from planning permission in most cases. Asbestos roofs cannot take panels.
Which shed roofs suit solar panels
| Roof | Suits panels? | What to know |
|---|---|---|
| Box-profile steel | Yes | The standard modern shed roof. Panels fix to the purlins, and the roof usually carries the load without reinforcement. |
| Fibre-cement | Case by case | The sheets are brittle, so fixings go into the purlins, never the sheet alone. An older roof is better re-sheeted first. |
| Asbestos-cement | No | Common on sheds built before the 1990s. Installers will not drill or mount on it. It has to be professionally stripped and replaced first. |
Older sheds can have light purlins. Ask the installer to confirm the roof can carry the load before you agree a price.
How much roof you need
- Per kWp: 4 to 5 m² of roof, generating about 860 kWh a year
- Typical farm buildings: 200 to 1,000 m² of roof
- One hay shed: room for a 50 to 100 kWp system
- Panel weight: about 12 to 15 kg per m²
Pitch and direction
- Pitch: 10 to 35 degrees is ideal
- South: the highest output across the year
- East and west: lower peak, but generation is spread across the day, which suits morning and evening milking
Planning permission for panels on farm buildings
| Where the panels go | Planning | Conditions |
|---|---|---|
| On a farm building roof | Exempt, no cap on area | Within 15 cm of a pitched roof, at least 50 cm in from the edge, and not above the ridge |
| On a roof inside a Solar Safeguarding Zone | Exempt up to 300 m² | Tell the council in writing within 4 weeks of starting |
| On a farm building wall | Exempt up to 75 m² | Within 15 cm of the wall and 50 cm in from its edge |
| Ground-mounted in the yard | Exempt up to 75 m² | No more than 2.5 m high, and not in front of the nearest farm building to the road |
| Solar farm exporting to the grid | Permission needed | The exemptions only cover power mainly used on the holding |
The exemptions apply when most of the electricity, over 50%, is used on the holding. A protected structure always needs permission. There are 43 Solar Safeguarding Zones in Ireland, so check with your county council whether the farm is inside one.
The exemptions are set out in the planning regulations of October 2022 (S.I. 493 of 2022).
Things specific to the building
- Pig units: ammonia and dust corrode fixings and cabling, so ask for suitably rated mounting, isolators and enclosures
- Separate meters: if the yard and the house have their own electricity supplies, the array goes on the one with the biggest daytime load
- Export: a smart meter is needed to be paid for surplus power
- Grant: TAMS 3 pays 60% of the cost of a system on a farm building. See farm solar grants