  • Hickey's Home Farm (Gerard Hickey)380 kW
    Cost
    €380,000
    Grant
    LEADER 50%, €190,000
    Share of use
    231,000 kWh of 813,000 kWh yard use in 2025
    Payback
    Three years

    Source: Irish Farmers Journal

  • O'Shea Farms, Piltown250 kW
    Cost
    €287,500 project (Interreg Europe summary, snippet only)
    Grant
    SEAI Better Energy Communities (20% per Interreg Europe summary)
    Saving
    About €19,000 a year actual, against a forecast €25,000
    Share of use
    About 10% of the business's energy
    Payback
    10 to 11 years actual, against a forecast of seven to eight years

    Source: Irish Farmers Journal

  • Belview Eggs (Dermot and Nicola Herlihy)100 kW
    Grant
    TAMS (amount not stated)
    Payback
    5 years

    Source: OHK Energy

  • Carrickboy farm (Donal and Dermot Brady), Ardagh100 kW
    Cost
    Over €100,000
    Grant
    SEAI Better Energy Communities 30%
    Share of use
    Up to 80% of needs on a sunny day
    Payback
    About five years (Local Power calculation)

    Source: Irish Farmers Journal

  • Nigel Flynn, Clones74 kW
    Cost
    About €45,000 in 2019; about €30,000 for the 2024 expansion
    Grant
    SEAI Better Energy Communities about 30% (2019); TAMS Solar Capital Investment Scheme (2024)
    Share of use
    Bills down about 30%
    Payback
    First system three years; expansion estimated at two and a half years

    Source: Irish Farmers Journal

  • Laurlstown Farm (Donal Callery)63 kW
    Saving
    Around €16,000 a year

    Source: FarmGen

Show 27 more farms
  • Unnamed Cork farm62 kW
    Grant
    TAMS 3 60%
    Saving
    €13,175 a year at current unit cost

    Source: SolarCo

  • Michael Callan, Dunleer60 kW
    Payback
    5.5 years

    Source: Agriland

  • John and Una Dolan, Fardrum50 kW
    Cost
    €60,000 plus VAT, no grant
    Grant
    No grant
    Share of use
    Target of a 30% cut in the electricity bill
    Payback
    About five years

    Source: Teagasc

  • Ted O'Sullivan, Bansha40 kW
    Cost
    About €65,000 overall
    Grant
    TAMS Solar PV grant (amount not stated)
    Share of use
    Savings of 92% after six weeks (early summer snapshot)
    Payback
    Two to three years

    Source: Agriland

  • Kehoe's Ketripack40 kW
    Grant
    SEAI Better Energy Communities (30% per search summary)
    Saving
    €11,340 a year (search summary; solar and lighting combined)

    Source: ManagEnergy (European Commission)

  • Fitzgerald family farm, Castlegregory33.3 kW
    Grant
    TAMS 3 60% on the farm system
    Share of use
    About 60% of farm consumption in July 2026
    Payback
    Under three years (projected)

    Source: ProSolar

  • Fergal and Amy Coughlan, Innishannon32.4 kW
    Cost
    €50,000 before grant; €15,310 after TAMS grant and accelerated capital allowance
    Grant
    TAMS 60%, €30,000
    Saving
    €6,500 a year
    Share of use
    85% of electricity usage
    Payback
    2.4 years

    Source: Irish Farmers Journal

  • Andrew and Daniel McHugh27.7 kW
    Cost
    Around €24,000 after grants
    Grant
    TAMS 60% on panels and on batteries up to half the PV size
    Saving
    €6,000 in the first year
    Payback
    Around four years

    Source: Irish Farmers Journal

  • Richard Starrett23.5 kW
    Cost
    €15,525 for the 18 kW panels and 10 kW storage, with TAMS at 60% and VAT at 13.5% excluded
    Grant
    TAMS 60%
    Saving
    €4,436 a year (phase 2 projection)
    Payback
    Phase 1 four years; phase 2 projected 3.5 years

    Source: Teagasc

  • Brian Forde21.6 kW
    Grant
    TAMS, eligible for up to 60%
    Share of use
    32% self-sufficiency; annual savings over 30%
    Payback
    4.2 years (projected)

    Source: Solgrid

  • John and Rory McEvoy20 kW
    Cost
    €38,000, paid outright
    Share of use
    34% of farm energy demand

    Source: Irish Farmers Journal

  • Hall Donnell, Ballymagorry20 kW
    Grant
    No grant
    Share of use
    100% of farm and house use, with surplus sold
    Payback
    Within four years

    Source: Irish Farmers Journal

  • George Knipe, Battleford Road20 kW
    Grant
    No grant
    Share of use
    Expected to save approximately one third
    Payback
    Within five or six years (expected)

    Source: MGMPR (press release)

  • Jackie and Stephen Hamilton, Collone15 kW
    Cost
    £11,500 excluding VAT, no grant
    Grant
    No grant
    Saving
    £3,807 a year
    Share of use
    12,775 kWh against farm use of 111,542 kWh a year
    Payback
    Just over three years

    Source: Irish Farmers Journal

  • Joe Swayne, Ballon14.7 kW
    Grant
    TAMS
    Share of use
    29.9% self-sufficiency
    Payback
    2.2 years (modelled)

    Source: Solgrid

  • Shane Hegarty, Kilcock13.8 kW
    Cost
    €28,000
    Grant
    TAMS, €13,000
    Share of use
    Bills down about 74%
    Payback
    Under three years

    Source: Irish Farmers Journal

  • Cathal Moran, Skeoughvosteen11 kW
    Cost
    €14,500 including inverter and buried cable, no grant
    Grant
    No grant
    Share of use
    10% of farm use (July to December 2018)
    Payback
    Hypothetical only: 9.2 years with a 40% TAMS II grant, 8 years at 60%

    Source: Irish Farmers Journal

  • PJ O'Halloran, Ballyheigue10.8 kW
    Saving
    €3,166 a year from solar
    Share of use
    Bill cut by 71% including a supplier switch; a later article gives 57% from solar only
    Payback
    Five years

    Source: Agriland

  • J & M Dairies (John and Marguerite Ryan), Gortnahoe9.5 kW
    Cost
    About €25,000
    Grant
    SEAI Better Energy Communities 30%
    Saving
    €1,889.76 a year
    Share of use
    About 40% of farm demand

    Source: Interreg Europe

  • Jonathan Fennell, near Carlow town7.4 kW
    Grant
    TAMS II 40%, plus accelerated capital allowance and VAT reclaim
    Payback
    Less than six years

    Source: Agriland

  • Douglas Kinkade6.5 kW
    Cost
    €11,000 for the first 21 panels (search summary, not confirmed in the text opened)
    Grant
    30% grant plus tax relief
    Share of use
    Designed for about 30% of daytime electricity needs

    Source: Agriland

  • Ticey Allen, Newport6.1 kW
    Cost
    €10,000 including VAT before grant; €6,000 after grant
    Grant
    TAMS 40%
    Saving
    About €900 a year (expected)
    Payback
    About 6.6 years

    Source: Irish Farmers Journal

  • Duniry Farm (Ambrose Hodgins)5.7 kW
    Share of use
    Electricity bill saving of 31%
    Payback
    6 years

    Source: Solgrid

  • David Foran
    Share of use
    Half of total electricity consumption in 2020
    Payback
    Within 5 years (farmer's expectation)

    Source: Sunstream Energy

  • Eddie, dairy farmer
    Grant
    TAMS 3
    Saving
    €7,259 a year (estimate, from search summary)
    Payback
    3 years 5 months (estimate, from search summary)

    Source: Agriland

  • Kilbrew Stables (Lynch)
    Cost
    House system €11,200, paid €9,400 after subsidy; yard system €10,937, paid €8,600 after subsidy
    Grant
    Subsidy of €1,800 (house) and €2,337 (yard); scheme not named

    Source: The Irish Field

  • Knockfee Farm
    Share of use
    50% of daytime usage
    Payback
    4 years

    Source: SolarCo presentation (hosted by Teagasc)

These are the figures each farmer or installer gave. Some are measured from bills and some are estimates, and electricity prices differ between the years they were reported. Use them as a range, not a promise. For current prices see farm solar panel cost.

What size system do farms install, by farm type?

Farm typeFarms listedSmallestLargest
Dairy326 kW63 kW
Dairy with pigs1150 kW150 kW
Pig350 kW130 kW
Poultry720 kW100 kW
Tillage, potatoes and horticulture915 kW380 kW
Beef, drystock and mixed25.7 kW33.3 kW
On-farm food business1299.7 kW299.7 kW
Equine1Not statedNot stated
Other or type not stated58.7 kW100 kW
  • Dairy: Milking, cooling and water heating run twice a day, every day, so a dairy farm uses most of what its panels produce.
  • Pig: Ventilation, heat lamps and feed systems run around the clock, which suits a large array.
  • Poultry: Fans, lighting and feed lines run all day, and the long house roofs take many panels.
  • Tillage, potatoes and horticulture: Cold stores and grain dryers are the big loads. Cold storage runs through summer, when panels produce most.

TAMS 3 pays 60% on systems up to 62 kWp. See farm solar grants for which grant fits which size.

What do farmers say about it?

  • "savings of around €16,000 a year" Laurlstown Farm (Donal Callery), dairy (FarmGen)
  • "half my total electricity consumption for the year" David Foran, Waterford, dairy (Sunstream Energy)

Which dairy farms have solar panels?

FarmCountySystemInstallerSource
Laurlstown Farm (Donal Callery)450 cows63 kW + batteryPV Generation / FarmGenFarmGen
Michael Callan, Dunleer450 cowsLouth60 kWAEI (Alternative Energy Ireland)Agriland
John and Una Dolan, Fardrum400 cowsWestmeath50 kW + batteryNot namedTeagasc
Ted O'Sullivan, Bansha200 cowsTipperary40 kW + batteryHome & Agri EnergyAgriland
Tom and Niamh McWalter, Milltown160 cowsGalway33.2 kWWestQuay EnergyAgriland
Fergal and Amy Coughlan, Innishannon160 cowsCork32.4 kW + batteryHome and Agri EnergyIrish Farmers Journal
Unnamed robotic milking farm30 kWLocal PowerLocal Power presentation (hosted by Teagasc)
Andrew and Daniel McHugh200 cowsLongford27.7 kW + batteryIFA / Bord Gáis EnergyIrish Farmers Journal
Show 24 more dairy farms
FarmCountySystemInstallerSource
Unnamed robotic dairy farm25 kWLocal PowerLocal Power presentation (hosted by Teagasc)
Richard StarrettDonegal23.5 kW + batteryNot namedTeagasc
Brian FordeGalway21.6 kW + batterySolgridSolgrid
John and Rory McEvoyLaois20 kWPV Generation / FarmGenIrish Farmers Journal
Hall Donnell, Ballymagorry110 cowsTyrone (NI)20 kWNot namedIrish Farmers Journal
Unnamed Westmeath dairy farmWestmeath15 kWLocal PowerLocal Power presentation (hosted by Teagasc)
Jackie and Stephen Hamilton, Collone245 cowsArmagh (NI)15 kWStart SolarIrish Farmers Journal
Shane Hegarty, Kilcock50 cows, plus about 30 calf-to-beef a yearMeath13.8 kW + batteryLocal PowerIrish Farmers Journal
Cathal Moran, Skeoughvosteen320 cowsKilkenny11 kWActiv8 (for Elgin Energy)Irish Farmers Journal
Liam Delaney, PortlaoiseLaois11 kWAEIAgriland
PJ O'Halloran, Ballyheigue52 or 55 cowsKerry10.8 kWSwyft EnergyAgriland
J & M Dairies (John and Marguerite Ryan), Gortnahoe130 cowsTipperary9.5 kW + batteryNot namedInterreg Europe
Unnamed dairy farm9 kWLocal PowerLocal Power presentation (hosted by Teagasc)
Michael and Mary Purcell, ThurlesTipperary7.5 kW + batteryLocal PowerAgriland
Jonathan Fennell, near Carlow town120 cows, plus beefCarlow7.4 kW + batteryAEIAgriland
Douglas Kinkade110 cowsCavan6.5 kW + batteryLocal PowerAgriland
Ticey Allen, Newport124 cowsTipperary6.1 kW + batteryKB ElectricalIrish Farmers Journal
Francis Nolan, Coolcullen130 cowsKilkenny6 kWFarmGen (Glanbia)Agriland
David ForanWaterford24 or 27 kW, ground-mountedSunstream EnergySunstream Energy
Pat FarrellWaterford24 or 27 kW, ground-mountedSunstream EnergySunstream Energy
Eddie, dairy farmerTipperary33 panels, 10 kW inverter (kWp not stated) + batteryNuSolas EnergyAgriland
John Murphy, DripseyCork32 panels, 6 kW inverterIFA / Bord Gáis Energy pilotAgriland
Conor DesmondAbout 130 cowsCork68 panels (kWp not stated) + batteryNot namedAgriland
Amanda Mooney, Winter Milk FarmWicklow37 panels (kWp not stated)PV Generation / FarmGenPV Generation

Which pig farms have solar panels?

FarmCountySystemInstallerSource
Unnamed Wexford pig producerWexford130 kWLocal PowerLocal Power presentation (hosted by Teagasc)
Carrickboy farm (Donal and Dermot Brady), Ardagh2,000 sowsLongford100 kWLocal PowerIrish Farmers Journal
Unnamed Kildare pig farmKildare50 kWLocal PowerLocal Power presentation (hosted by Teagasc)

Which poultry farms have solar panels?

FarmCountySystemInstallerSource
Belview Eggs (Dermot and Nicola Herlihy)140,000 hensLouth100 kWOHK EnergyOHK Energy
Nigel Flynn, Clones145,000 broilersMonaghan74 kW + batteryLocal PowerIrish Farmers Journal
Trevor, poultry farmer40,000 layers50 kWNot namedTeagasc
Unnamed NI poultry farmNorthern Ireland50 kWNot namedIrish Farmers Journal
George Knipe, Battleford RoadThree poultry housesNorthern Ireland20 kWAmber Green SolarMGMPR (press release)
Robert McBrideMonaghanNot statedIFA / Bord Gáis Energy pilotAgriland
Cumry Poultry FarmNot statedLocal PowerLocal Power

Tillage, potato and horticulture farms with solar panels

FarmCountySystemInstallerSource
Hickey's Home Farm (Gerard Hickey)Six 600-tonne cold storesLouth380 kWLocal PowerIrish Farmers Journal
O'Shea Farms, PiltownPotato store for up to 12,500 tKilkenny250 kWSolar Electric (now Pinergy)Irish Farmers Journal
Unnamed cereal feed mill and farm150 kWLocal PowerLocal Power presentation (hosted by Teagasc)
Unnamed Meath horticultural farmMeath60 kWLocal PowerLocal Power presentation (hosted by Teagasc)
James and Zita O'KeeffeMeath50 kWNot namedTeagasc
Kehoe's KetripackWexford40 kWNot namedManagEnergy (European Commission)
Unnamed Waterford horticultural farmWaterford30 kWLocal PowerLocal Power presentation (hosted by Teagasc)
Unnamed Cork horticultural farmCork15 kWLocal PowerLocal Power presentation (hosted by Teagasc)
Knockfee FarmTipperaryNot statedSolarCoSolarCo presentation (hosted by Teagasc)

Other farms with solar panels

FarmCountySystemInstallerSource
Killowen FarmOn-farm food business299.7 kWLocal PowerLocal Power
Hill Top Agri FarmsDairy with pigsCork150 kWSolarCoSolarCo presentation (hosted by Teagasc)
Unnamed Wexford farmOther or type not statedWexford100 kWLocal PowerLocal Power presentation (hosted by Teagasc)
Leahy Open FarmOther or type not statedCork70 kWLocal PowerLocal Power presentation (hosted by Teagasc)
Unnamed Cork farmOther or type not statedCork62 kWSolarCoSolarCo
Fitzgerald family farm, CastlegregoryBeef, drystock and mixedKerry33.3 kW + batteryProSolarProSolar
Joe Swayne, BallonOther or type not statedCarlow14.7 kW + batterySolgridSolgrid
Unnamed Connaught agricultural clientOther or type not stated8.7 kWWestQuay EnergyWestQuay Energy
Duniry Farm (Ambrose Hodgins)Beef, drystock and mixedGalway5.7 kWSolgridSolgrid
Kilbrew Stables (Lynch)EquineMeath10 panels on stables, 10 on house + batteryNot namedThe Irish Field

How much do solar farms pay per acre to lease land?

Leasing land to a solar developer is a separate decision from putting panels on a shed. The developer builds a grid-scale solar farm and pays rent. The farm does not use the power.

RentFigureSource
Rent per acre, September 2026Quoted as "in the region of" this range, and rising, by Aidan Stakelum of Perigus Energy on 30 September 2026.€1,200 to €1,300 per acre per yearIrish Farmers Journal
Rent per acre, December 2025Figure given by Solar Ireland, the industry body, on 10 December 2025.€1,000 to €1,400 per acre per yearIrish Farmers Journal
Rent per hectare, July 2025 (full range)From A Solar Energy Guide for Dairy Farms, July 2025. The source gives the figure per hectare and does not convert it to acres.€2,200 to €3,500 per hectare per yearTeagasc / MTU
Rent per hectare, July 2025 (more common range)The same guide says this narrower range "is more common".€2,200 to €3,000 per hectare per yearTeagasc / MTU
Rent per acre, August 2023Figure given by Barry Caslin of Teagasc on 5 August 2023.€800 to €1,200 per acre per yearIrish Farmers Journal
Rent per acre, earlier boom-era reportOlder Farmers Journal report with no date given. Snippet only; the page was not opened.€1,000 to €1,500 per acre per yearIrish Farmers Journal
Teagasc worked example, 20-year leaseWorked example in the Teagasc guide showing the effect of income tax on lease income over 20 years.€2,200 per hectare per year gives €44,000 per hectare, or €26,400 per hectare after 40% income taxTeagasc / MTU
Maintenance incomeNot rent. A figure of around €200 per acre "was discussed" for some arrangements, reported on 30 September 2026.Around €200 per acreIrish Farmers Journal
  • These figures are for leasing land to utility-scale solar developers, which is a different proposition from an on-farm system.
  • Lease length is given as "25 years or more" in the Teagasc guide and "around 40 years" in the Irish Farmers Journal on 30 September 2026.
  • The option period is five years, extendable by five (Irish Farmers Journal, 30 September 2026).
  • Rent is typically linked to inflation (Teagasc guide).
  • Land take is about two hectares per MW (Teagasc guide).
  • Panels cover about 40% of a site (Solar Ireland).
  • Lease and option income is fully taxed with no expenses offset.
  • Teagasc example: a 20-year lease at €2,200 per hectare gives €44,000 per hectare, or €26,400 per hectare after 40% income tax.
  • Keeping panels on under 50% of the holding matters for agricultural relief and retirement relief (Teagasc guide).
  • Barry Caslin of Teagasc: "You will probably lose about 30% of your entitlements on that land".
  • A maintenance income of around €200 per acre was discussed for some arrangements (Irish Farmers Journal, 30 September 2026).
  • Greenhills Dairies in Killeagh, Co. Cork (1,100 cows) agreed a 250 MW project with Ørsted, reported 19 March 2025. No rent was disclosed.
  • The Teagasc rent figure is per hectare and the source did not convert it to a per-acre figure.

What does the planning register show for farms?

The national planning register holds 63 applications to 30 September 2026 for solar panels that supply a farm. Councils granted 59 and refused 1. 45 are on roofs and 12 are ground-mounted.

Farm type in the applicationApplications
Farm, type not stated32
Dairy3
Pig8
Poultry7
Equine5
Mushroom and horticulture6
Tillage and grain2

The number is small because solar on a farm building roof is usually exempt from planning. See the planning rules for farm buildings. The applications that name the farm or state a size:

FarmCountySize applied forStatusPlanning record
Not namedMushroom and horticultureMonaghan1000 kWGranted2020, ref 20145
Not namedFarm, type not statedCork500 kWAwaiting decision2017, ref 17/5353
Not namedFarm, type not statedCork500 kWGranted2023, ref 23/6479
Not namedFarm, type not statedCork500 kWInvalid application2026, ref 26/2211
Wellesley FarmFarm, type not statedLimerick357 kWRefused2025, ref 25105
Lyons Estate Research FarmFarm, type not statedKildare250 kWGranted2017, ref 17162
Martinstown StudEquineLimerick231.8 kWGranted2025, ref 2560649
Not namedFarm, type not statedLongford100 kWGranted2018, ref 1857
Show 11 more applications
FarmCountySize applied forStatusPlanning record
Not namedDairyMeath100 kWGranted2020, ref AA201849
Not namedMushroom and horticultureTipperary43.2 kWGranted2018, ref 18600425
Not namedFarm, type not statedCork6 kWGranted2020, ref 20/6595
Hilltop FarmsFarm, type not statedCorkNot statedGranted2016, ref 16/6506
Glenilen FarmFarm, type not statedCorkNot statedGranted2022, ref 22/603
Ardenode StudEquineKildareNot statedGranted2021, ref 21442
Monaghan MushroomsMushroom and horticultureKildareNot statedGranted2023, ref 23837
Ravensdale NurseriesMushroom and horticultureLouthNot statedGranted2026, ref 2689
Woodridge StablesEquineMeathNot statedGranted2022, ref 221664
Grantstown NurseriesMushroom and horticultureWaterfordNot statedGranted2019, ref 19287
Gigginstown House StudEquineWestmeath196 panelsBuilt2022, ref 22427

"Granted" is permission to build. A scheme is shown as built only where a published report says so.

How was this list put together?

  • Farms: taken from the farming press, Teagasc and installers' own case studies. Each row names its source.
  • Figures: as reported. Nothing has been estimated or filled in where a source was silent.
  • Planning: every application in the national planning register that mentions solar was read, and those supplying a farm were kept.

Data last reviewed October 2026. Installers are named as the source reports them.

Common questions

Pricing solar for your farm?

Get farm solar quotes

Tell us about the farm and an installer will price a system and explain the TAMS grant.

Step 1 of 3

Where are you at?